![]() |
![]() |
| Handan Iron and Steel Works | Tangshan Iron and Steel Works |
| Item Name | Model | The number of (Taiwan) | Contract No. |
| China Metallurgical Equipment Corporation | DTII -B - 1200mm TD75 -B - 1000mm | 04ZNN3-487-N002N3 | |
| Shenyang Coal Industry Group Hung Ling-belt coal preparation plant | DJ - B=1000mm ,B=1200mm | 2 | CSC2005-HL03 |
| Zhangcun Preparation Plant Extension Project | DTII - B=1400mm ,B=1000mm | 4 | CBC2005 - ZC02 |
| Hebei Jinniu Energy Corp. | DTII - B=1400mm | 1 | 1A - 060403 |
| China Steel Equipment Corporation |
TD75 - B=1000mm
DJ - B=1200mm DTII - B=1000mm |
4 | 06HN - 194 - N002Y2 |
| Rizhao Iron and Steel Co., Ltd. | DTII - B=800mm ,B=1000mm ,B=1200mm | 11 | Ye (2006), ladle up the word (138) |
| Indonesia LHOKNGA2 × 16.5MW-owned power plant project |
DTII - B=1000mm
Discharge- plow - B - 1000mm |
7 | CHEC - LHO - BC - 3 |
| Tangshan Iron and Steel Corporation | DTI - B=1000mm ,B=1200mm ,B=1400mm | 11 | TG3200-2049 |
| Rizhao Iron and Steel Co., Ltd. |
DTII - B=1600mm ,B=800mm , B=1000mm ,B=1200mm ,B=1400mm |
23 | Ye (2006), ladle up the word (152) |
| Tangshan Iron and Steel Corporation Ironworks | SHUTTLE-cloth B = 1200mm | 1 | DS-070318-03-15 |
| Xuanhua Steel Group Co., Ltd. |
DTII ( A ) B - 1200mm , B=1000mm Unloading cars |
2 | XGLT360-CT-SB-022 |
| Tangshan City Hengan Industrial Co., Ltd. |
DTII - B=1400mm ,B=800mm , B=1000mm , B=1200mm |
27 | Ye (2007) by the word TANG Heng-package (021) |
| Qian'an city of Jiujiang Wire Co., Ltd. |
DJ - B=1400mm 4
DTII - B=1200mm , B=800mm ,B=1000mm |
10 | |
| Handan Iron and Steel Group Co., Ltd. |
DTII ( A )B=1000mm , B=1200mm , B=1400mm |
13 | XQ - JH - GN - 01-012 |
| Thailand with an annual output of 20,000 tons of carbon disulfide projects | DTII - B - 1200mm | 2 | CNC-01-06-MP-009 |
| Handan Iron and Steel Group Co., Ltd. |
DTII ( A )- B=1200mm ,B=1400mm |
16 | XQ-JH-GN-01-015 |
| Xuanhua Steel Group Co., Ltd. | DTII ( A )- B=1200mm | 4 | XG2007-71 |
| Xuanhua Steel Group Co., Ltd. | DTII ( A )- B=1200mm ,B=1400mm | 4 | XGLT360-CT-SB-085 |
| Ukraine Illich PCI project | DTII - B=1000mm | 2 | HTXG06-030W |
| Cangzhou aspect Industrial Co., Ltd. | DTII - B=1400mm ,B=800mm | 4 | 07ZGME-GZN0032-LT/05 |
| By 2 # 3 # steel works sintering |
DTII ( A )- B=800mm ,B=1000mm ,
B=1200mm ,B=1400mm |
46 | CG3SB - 025 |
| Coal International Engineering Group in Shenyang and Design Institute |
DTII - B=1000mm ,B=800mm , B=1200mm 7 Taiwan-plow-Discharge B=800mm |
2 | GZ2204-SB-2 |
| Bazhou Ruixing Chemical Co., Ltd. |
DTII - B=1000mm |
2 | |
| Vietnam 55 cubic meters of blast furnace | DTII - B=1200mm | 4 | LP-518/HS |
| Ganyu City public investment management Limited 2 × 90 square meters sintering projects |
DTII - B=1000mm ,B=800mm , B=650mm16 TD75 - B=1000mm , B=800mm ,B=650mm |
6 | Steel workers in a hospital [2008] No. 621 |